ProSoft Technology PTQ-LNG Manual do Utilizador Página 38

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 103
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 37
PTQ-LNG Quantum / Unity Platform Setting Up the ProTalk Module
Landis & Gyr Telegyr Interface Module
Page 38 of 103 ProSoft Technology, Inc.
May 29, 2007
5.1.2 Inserting the 1454-9F connector
Insert the 1454-9F connector as shown. Wiring locations are shown in the table:
5.1.3 Install the ProTalk Module in the Quantum Rack
1 Place the Module in the Quantum Rack. The ProTalk module must be placed
in the same rack as the processor.
2 Tilt the module at a 45° angle and align the pegs at the top of the module with
slots on the backplane.
Vista de página 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 102 103

Comentários a estes Manuais

Sem comentários