
PLX8x-MNET-61850 ♦ Communication Gateway
User Manual Modbus TCP/IP to IEC 61850
Page 192 of 228 ProSoft Technology, Inc.
May 14, 2014
Functional constraint - GSSE control
Logical node - General security application
Generic Substation Status Event
Logical node - Test generator
Harmonics (phase related)
Harmonics (non-phase related)
Hertz – frequency cycles/second
Out-of-scope: The implementation of the item is not within the
scope of this standard
Status Inputs/Output contacts, or channels
IED Configuration Description
International Electrotechnical Commission
Intelligent Electronic Device
Institute of Electrical and Electronic Engineers
Internet Engineering Task Force
Logical node - Operator interface (control local at bay
level/control at station level)
Impedance (non-phase related)
INteger status – Controllable
Comentários a estes Manuais